Composition — construction
Selira Lintel
Every system on a project is right about its part. Selira Lintel holds the whole — programme, drawings, deliveries, inspections and payments, in one model, with who said what, and when. A demo on sample data; we are looking for design partners in the Gulf.
A composition is the platform already configured for one kind of operation — its things, its words, its systems. You start here and change it, not from an empty model.
The questions it is built around
How many of these can your systems answer in one go?
Construction already keeps the record — the programme, the drawings, the reports. A record remembers; it doesn't answer. Today somebody puts the answer together by hand, across systems and calls.
- Time
- What did we know on the day we said yes, before the drawing changed?
- Space
- Where is our material right now: on site, on a truck, at the supplier, or lost?
- Truth
- Is the work really finished, or did only the contractor say so? Who checked it?
- Source
- Three reports each show a delay. Is it the same delay, or three different ones?
The operational picture
A record says what happened. Lintel knows where things stand.
The delivery note says thirty-nine sheets of mesh arrived. Is that enough for tomorrow’s pour?
Every delivery, pour and inspection moves the state of the project — what’s on site, what’s built, what’s inspected, what’s only claimed. It is read from the papers the site already makes, so there is no new process. Where nobody counted, it says so.
When something changes
Two things that arrive at a contractor from outside
A quarry fails a barge's load the afternoon before it tows; a subcontractor's monthly application claims more than the record shows. Scenarios, with illustrative numbers, of where Lintel is going.
Dense by nature, best on a larger screen
[ fig. 1 · lintel · scenarios · 11/11 · the barge tows at first light, fully loaded ]
What the composition contains
The programme
Activities, milestones and the baseline, with every update kept, so a date can be read as it stood on any day.
Drawings and revisions
Each revision known from the day it was issued, so “what did we know when we said yes” has an answer.
The site and the building
Site, building, storey, zone and room as walkable containment, so a question can cross levels.
Materials and deliveries
A lot followed from the supplier’s yard, through the truck and the laydown, to the storey where it is built in.
Progress as claims
Claimed, inspected and certified kept apart, each with who said it and on whose authority.
Source bindings
The scheduling tool, document control, the cost system and the site’s sheets, each keeping its own version, bound where they describe the same thing.
Bring us a question that's hard to answer today.
We model it with you — your systems stay.