Skip to content

Composition — construction

Selira Lintel

Every system on a project is right about its part. Selira Lintel holds the whole — programme, drawings, deliveries, inspections and payments, in one model, with who said what, and when. A demo on sample data; we are looking for design partners in the Gulf.

A composition is the platform already configured for one kind of operation — its things, its words, its systems. You start here and change it, not from an empty model.

The questions it is built around

How many of these can your systems answer in one go?

Construction already keeps the record — the programme, the drawings, the reports. A record remembers; it doesn't answer. Today somebody puts the answer together by hand, across systems and calls.

Time
What did we know on the day we said yes, before the drawing changed?
Space
Where is our material right now: on site, on a truck, at the supplier, or lost?
Truth
Is the work really finished, or did only the contractor say so? Who checked it?
Source
Three reports each show a delay. Is it the same delay, or three different ones?

The operational picture

A record says what happened. Lintel knows where things stand.

The delivery note says thirty-nine sheets of mesh arrived. Is that enough for tomorrow’s pour?

Every delivery, pour and inspection moves the state of the project — what’s on site, what’s built, what’s inspected, what’s only claimed. It is read from the papers the site already makes, so there is no new process. Where nobody counted, it says so.

When something changes

Two things that arrive at a contractor from outside

A quarry fails a barge's load the afternoon before it tows; a subcontractor's monthly application claims more than the record shows. Scenarios, with illustrative numbers, of where Lintel is going.

INTUI · PEOPLE AND AGENTS, TOGETHERORRERY · HOLDS AND RUNS THE OPERATIONBASINbreakwater headbargebreakwaterour stockpileweighbridgeB's stockpilemarine officefully loaded by 05:00UPDATED021,100 t to the bargeUPDATED03300 t, transfer signedUPDATED0440 of 70 loads not before ThuOWN STOCK: 1,100 OF 1,400 TNEEDS A DECISION ABOVE THE PLAN01transfer signed · 300 tFROM THE OPERATIONS DIRECTORANSWERED
tow half-loaded2 idle days
the head waits 2 days
both stockpiles1 night shift
1,100 t ours + 300 t B's, tonight
project manager · owns the load-out
hold for Thu2 charter days
the tug is lost from Thursday

Dense by nature, best on a larger screen

[ fig. 1 · lintel · scenarios · 11/11 · the barge tows at first light, fully loaded ]

What the composition contains

The programme

Activities, milestones and the baseline, with every update kept, so a date can be read as it stood on any day.

Drawings and revisions

Each revision known from the day it was issued, so “what did we know when we said yes” has an answer.

The site and the building

Site, building, storey, zone and room as walkable containment, so a question can cross levels.

Materials and deliveries

A lot followed from the supplier’s yard, through the truck and the laydown, to the storey where it is built in.

Progress as claims

Claimed, inspected and certified kept apart, each with who said it and on whose authority.

Source bindings

The scheduling tool, document control, the cost system and the site’s sheets, each keeping its own version, bound where they describe the same thing.

Bring us a question that's hard to answer today.

We model it with you — your systems stay.